


BACS Riyadh Metro Project Email Formats
Construction • Al Zahra, Riyadh, Saudi Arabia • 501-1000 Employees
BACS Riyadh Metro Project Email Formats
BACS Riyadh Metro Project uses 3 email formats. The most common is {first name}{last name} (e.g., johndoe@bacsrmp.com), used 74.3% of the time.
| Format | Example | Percentage |
|---|---|---|
{first name}{last name} | johndoe@bacsrmp.com | 74.3% |
{first initial}{last name} | jdoe@bacsrmp.com | 22.9% |
{last name}{last name} | doedoe@bacsrmp.com | 2.9% |
Key Contacts at BACS Riyadh Metro Project
Roy Haddad
Deputy Project Director
Hanna Ghawi
Deputy Project Director
Naim Abulaila
Director Project Delivery
Naim Abulaila
Delivery Director
Company overview
| Headquarters | Al Zahra, Riyadh, Saudi Arabia |
| Phone number | +966581175392 |
| NAICS | 23 |
| SIC | 374 |
| Keywords | Tunneling, Bridges, Stations, Metro Rail, Conracting |
| Founded | 2013 |
| Employees | 501-1000 |
| Socials |
About BACS Riyadh Metro Project
The BACS consortium will be responsible for the design and build of Lines 1 and 2 of the Riyadh metro network. These two lines will form part of the six-line metro system that will run for a total length of 176 kilometers across the city and includes 85 stations. Our scope of work on Lines 1 and 2 encompasses detailed structural, architectural and transit system design together with construction, testing and commissioning works. Our scope also includes the procurement of all products and materials necessary to support project delivery. We are fully responsible for the design and integration of the transit systems and the civil infrastructure. Working from the Employers Requirements, the BACS consortium will manufacture, furnish, install, test and commission all components related to both the transit systems and the civil infrastructure. Line 1 will stretch from north to south through the center of Riyadh, along the Olaya-Batha corridor, covering 38 kilometres. The line will include 22 stations and 4 transfer stations where it will connect with other new metro lines. Much of Line 1 will be underground. Line 2 will run east to west along King Abdullah Road and will be built mostly at grade (15km) with some elevated sections. This line will run east to west and will extend more than 25 kilometers with 13 stations and 3 transfer stations.
Employees by Management Level
Total employees: 501-1000
Seniority
Employees
Employees by Department
BACS Riyadh Metro Project has 372 employees across 11 departments.
Departments
Number of employees
Funding Data
BACS Riyadh Metro Project has never raised funding before.
BACS Riyadh Metro Project Tech Stack
Discover the technologies and tools that power BACS Riyadh Metro Project's digital infrastructure, from frameworks to analytics platforms.
JavaScript frameworks
Miscellaneous
JavaScript libraries
Frequently asked questions
4.8
40,000 users



