


BC2 Environmental Revenue
Environmental Services • Orange, California, United States • 21-50 Employees
BC2 Environmental revenue & valuation
| Annual revenue | $20,000,000 |
| Revenue per employee | $870,000 |
| Estimated valuation?This valuation is estimated based on industry average for the Environmental Services industry and current estimated revenues | $64,000,000 |
| Total funding | $7,500,000 |
Key Contact at BC2 Environmental
Erica Avalos Morales
Director Of Human Resources And Accounting
Company overview
| Headquarters | 1150 West Trenton Avenue, Orange, CA 92867, US |
| Phone number | +17147442990 |
| Website | |
| NAICS | 54162 |
| SIC | 178 |
| Keywords | Sonic Drilling, Direct Push Sampling, Air & Mud Rotary Drilling, Air Rotary Casing Hammer (Arch), Air- Vac Excavation, Groundwater Well Development, Hand Augering, Hollow-Stem Auger Drilling, Limited Access Rigs (Hsa & Direct Push), Well Monitoring And Sampling |
| Founded | 1993 |
| Employees | 21-50 |
| Socials |
BC2 Environmental Email Formats
BC2 Environmental uses 2 email formats. The most common is {first initial}{last name} (e.g., jdoe@bc2env.com), used 87.5% of the time.
| Format | Example | Percentage |
|---|---|---|
{first initial}{last name} | jdoe@bc2env.com | 87.5% |
{first name}{last name} | johndoe@bc2env.com | 12.5% |
About BC2 Environmental
BC2 Environmental is a California-based company specializing in environmental and geotechnical drilling. Established in 1993, we are committed to providing unparalleled client service and operating with the highest standards of integrity, professionalism, and safety. We offer a broad range of environmental and geotechnical drilling services, including soil sampling, groundwater and vapor well installation, direct push sampling and groundwater monitoring. BC2 possesses the capabilities to handle complex site investigations and remediation projects. BC2 Environmental has extensive experience with the construction, development, and abandonment of monitoring, extraction, and injection wells. Our field crews have successfully installed groundwater and vapor wells in various soil types and under demanding field conditions. Our drilling and monitoring equipment is among the newest and most powerful in the drilling industry. BC2's equipment fleet includes: Speedstar 50K Air, Mud, and Casing Hammer Rotary Drill Rigs Sonic Drill Rigs (Gus Pech, Terra Sonic Int.) Ingersoll Rand TH-100 Air and Mud Rotary Drill Rigs CME-75, 85, & 95 Hollow Stem and Rotary Drill Rigs Track Mounted Hollow Stem and Rotary Drill Rigs Limited Access and Low Clearance Drill Rigs Direct Push Sampling Rigs (Truck Mounted, Limited Access Track Mounted, and Dolly Mounted) Pump and Development Rigs Air-Vacuum Excavation Rigs for Hole Clearance and Well Abandonment Pressure Grouting. Our clients include leading environmental engineering firms, consultants, general contractors, and petroleum companies in the United States. BC2 serves as a primary drilling contractor on the most notable environmental programs in California, including the following: Shell, Chevron, BP/ARCO, Exxon Mobil, Conoco Phillips, U.S. Navy and Air Force, Ports of LA and Long Beach, Alameda Corridor Transportation Authority, Caltrans, LA Metro, LA County and City Departments of Public Works, and OCWD.
Employees by Management Level
Total employees: 21-50
Seniority
Employees
Employees by Department
BC2 Environmental has 7 employees across 5 departments.
Departments
Number of employees
BC2 Environmental Tech Stack
Discover the technologies and tools that power BC2 Environmental's digital infrastructure, from frameworks to analytics platforms.
JavaScript libraries
JavaScript libraries
Security
Ecommerce
Hosting
JavaScript frameworks
Security
Miscellaneous
JavaScript libraries
Ecommerce
JavaScript libraries
CMS
Frequently asked questions
4.8
40,000 users



