Prospeo
Hero Section BackgroundHero Section Background
Challenge Pipeline Supplies

Challenge Pipeline Supplies Revenue

Oil, Gas, and MiningFlag of GBManchester, England, United Kingdom1-10 Employees

$

Challenge Pipeline Supplies revenue & valuation

Annual revenue$256,665
Revenue per employee$86,000
Estimated valuation?$821,328
Total fundingNo funding

Key Contact at Challenge Pipeline Supplies

Flag of GB

Carl Vincent

Managing Director

Company overview

HeadquartersManchester, England, United Kingdom
NAICS211
Keywords
Induction Equipment Design And Build
Founded2016
Employees1-10

Challenge Pipeline Supplies Email Formats

Challenge Pipeline Supplies uses 1 email format. The most common is {first name}.{last name} (e.g., john.doe@challengeps.com), used 100% of the time.

FormatExamplePercentage
{first name}.{last name}
john.doe@challengeps.com
100%

About Challenge Pipeline Supplies

With a long history of providing services in the oil and gas pipeline construction industry the owners of CPS are now focused on providing induction heating and coating technology for new pipeline construction. Using the very best in design our products are tailored to customer needs using the highest quality materials and components. We know that all service providers in our sector require reliable and efficient equipment that can be maintained and serviced without the need for long supply chains. Using components with readily available service items means your equipment will never be out of service for longer than required. CPS now provides automated coating systems (ACM) for field joints for two component liquid coating materials such as epoxy or polyurethane. As a hand carried piece of equipment cycle times are significantly reduced to just a few minutes per joint. The system is safer, cleaner and faster than any other technique available for field joint coating. Our induction generators are diesel powered using the very latest Tier 4 engines sourced from world class engine manufacturers. Each unit is made to the very best in class mechanical and electrical design specifications and customer requirement can usually be incorporated during build. Peak power of up to 150kW means contractors have sufficient output to heat pipe for welding and coating on even the largest diameter projects in the coldest ambient temperatures. Our coils can be handled with just one operator due to our innovative latching mechanism reducing the need for additional labour during field activity. Using the very highest conductivity components our coils have class leading electrical efficiency meaning faster heat up times and longer dwell periods.

Employees by Management Level

Total employees: 1-10

Seniority

Employees

C-Suite

Employees by Department

Challenge Pipeline Supplies has 1 employees across 1 departments.

Departments

Number of employees

Funding Data

Challenge Pipeline Supplies has never raised funding before.

Frequently asked questions

Challenge Pipeline Supplies is located in Manchester, England, GB.
Challenge Pipeline Supplies generates an estimated annual revenue of $256,665. This revenue figure reflects the company's market position and business performance in its industry.
Challenge Pipeline Supplies has an estimated valuation of $821,328. This valuation is calculated based on industry-standard revenue multiples and reflects the company's growth potential and market positioning.
Challenge Pipeline Supplies was founded in 2016, making it 10 years old. The company has established itself as a significant player in its industry over this time.
Challenge Pipeline Supplies has approximately 1-10 employees. The company continues to grow its workforce to support its business operations and expansion.

4.8

40,000 users

top 50
high performer
most used
tier 1 accuracy

Build leads list with verified emails & mobiles