


Chepstow Plant International Email Formats
Construction • Caldicot, Wales, United Kingdom • 51-100 Employees
Chepstow Plant International Email Formats
Chepstow Plant International uses 2 email formats. The most common is {first initial}.{last name} (e.g., j.doe@chepstowplant.com), used 61.5% of the time.
| Format | Example | Percentage |
|---|---|---|
{first initial}.{last name} | j.doe@chepstowplant.com | 61.5% |
{first name}.{last name} | john.doe@chepstowplant.com | 38.5% |
Key Contacts at Chepstow Plant International
Ross Hayward
Asset Director
Iain Ormrod
Operations Director
Simon Cole
Finance Director
Company overview
| Headquarters | BEACON COURT NORMAN WAY SEVERN BRIDGE, IND ESTATE CALDICOT, NP26 5PT, GB |
| Phone number | +441291430028 |
| Website | |
| NAICS | 23 |
| SIC | 508 |
| Keywords | Health And Safety, Mining, Fleet Management, Material Handling, Construction, Performance Management, Learning And Development, Quarrying, Bulk Earthworks, Autonomy, Safe Solutions, Decarbonisation, Resource Extraction, Earthmoving Contractor, Engineered Earthworks |
| Founded | 1995 |
| Employees | 51-100 |
| Socials |
About Chepstow Plant International
With over fifty years of experience in the UK’s earthworks, aggregates, and minerals sector, Chepstow Plant International is renowned for delivering outstanding service through innovative, sustainable, and safety-first contracting solutions. By combining the UK’s most modern contracting fleet with award-winning safety standards and innovative technologies, including autonomous dump trucks and Net-Zero reduction initiatives, we deliver continuous and sustainable value to your operations. Chepstow Plant International core services cover contracting solutions, operated and non-operated hire ensuring that we're able to meet all our clients requests, no matter the timeframe. Fleet Management -> over 300 front line assets, 95% of which are less than 3 years old and all come equipped with advanced telemetry and most environmentally friendly equipment in the market. Earthworks -> With the capability to manage projects exceeding 3,000,000 m³ per year, we deliver operational efficiency and innovative methods that ensure cost-effective, prompt, and sustainable outcomes. Engineered Earthworks -> Slope stabilisation (before and after slope failure), Embankment works, Landfill cell construction (vertically stacked and conventional), Lagoon engineering modifications and ongoing management, GPS control to high tolerance Quarrying & Mining -> Quarrying sits at the heart of our expertise, positioning us as one of the UK’s leading contractors in this sector. With a flexible and diverse range of capabilities, we specialise in the extraction and processing of materials including limestone, granite, gritstone, kaolin, clays, sand, and gravel. Material Handling -> Bespoke fleet of wheel loaders & long-reach excavators can handle any material handling requirements from stockpile management and dredging to rail loading, clay mixing, and material processing, whilst also covering pressurised material handling environments such as Steel Works and Power Stations.
Employees by Management Level
Total employees: 51-100
Seniority
Employees
Employees by Department
Chepstow Plant International has 13 employees across 3 departments.
Departments
Number of employees
Funding Data
Chepstow Plant International has never raised funding before.
Chepstow Plant International Tech Stack
Discover the technologies and tools that power Chepstow Plant International's digital infrastructure, from frameworks to analytics platforms.
Security
Maps
CDN
Advertising
JavaScript libraries
Web servers
Miscellaneous
Programming languages
Authentication
Analytics
Analytics
Frequently asked questions
4.8
40,000 users



