


Greenway Bridge Email Formats
Construction • St Augustine, Florida, United States • 11-20 Employees
Greenway Bridge Email Formats
Greenway Bridge uses 1 email format. The most common is {first name} (e.g., john@greenwaybridgeco.com), used 100% of the time.
| Format | Example | Percentage |
|---|---|---|
{first name} | john@greenwaybridgeco.com | 100% |
Key Contact at Greenway Bridge
Timothy Kris
President & Chief Executive Officer
Company overview
| Headquarters | St Augustine, Florida, United States |
| Phone number | +19046793853 |
| Website | |
| NAICS | 23 |
| SIC | 162 |
| Keywords | Bridge Construction And Construction |
| Founded | 2008 |
| Employees | 11-20 |
| Socials |
About Greenway Bridge
Our services for bridge designs include new builds as well as repairs for pedestrian or vehicular timber bridges and boardwalks BEFORE RENOVATION Our goal is to extend the service life of your bridge, increase your return on investment and keep our landfills free from unnecessary waste. With decades of industry experience, we are the company to bring your bridge back to life. We refurbish timber vehicular or pedestrian bridge and bring it to the level of expected excellence. ASSESSMENT The first step to a proper refurbishment is a complete bridge inspection. Our team leader will provide you with an inspection proposal that outlines the service. One of our experienced personnel coordinates a visit to the site and performs an inspection on the existing bridge. COMPLETION AND WALK THRU Our professional team arrives prepared to walk through all aspects of the renovation with you. All necessary vehicle, roadway or pedestrian access coordination precautions are performed. The proper environmental systems are put in place to protect the environment. A detailed walk through is performed to ensure your satisfaction MAINTENANCE REPAIRS/OR STRUCTURAL UPGRADES Once the inspection is completed, an evaluation is elaborated describing any advisable repairs, reconstruction and/or maintenance. An assessment is performed in order to determine what system will bring the bridge up to safety standards, extend the service life and give it outstanding aesthetic appeal. A detailed report, depicting all items detailed in the review, will be sent for approval. Upon approval, your timber bridge refurbishment is scheduled. AFTER RENOVATION After completion of the tasks and receipt of final payment, a warranty and maintenance package is delivered and then reviewed with the client. REPAIR Greenway Services Inc. can repair a timber bridge due to storm damage, wood rot, a shift in the landscape, or improper construction.
Employees by Management Level
Total employees: 11-20
Seniority
Employees
Employees by Department
Greenway Bridge has 7 employees across 6 departments.
Departments
Number of employees
Funding Data
Greenway Bridge has never raised funding before.
Greenway Bridge Tech Stack
Discover the technologies and tools that power Greenway Bridge's digital infrastructure, from frameworks to analytics platforms.
JavaScript libraries
Video players
UI frameworks
JavaScript libraries
JavaScript libraries
Programming languages
WordPress plugins
Blogs
Hosting
SEO
Reverse proxies
Photo galleries
Frequently asked questions
4.8
40,000 users



