


IBERICA Energy & Data Centers
Business Consulting and Services • Tres Cantos, Community of Madrid, Spain • 11-20 Employees
Company overview
| Headquarters | Tres Cantos, Community of Madrid, Spain |
| Website | |
| NAICS | 5416 |
| Keywords | Project Management, Site Management, Design Reviews, Legalizations, Basic & Detailed Engineering For Power Systems, Commissioning/Cxa Contracts, Construction/Installation/Mep Coordination, Fat/Fwt/Sat/Reliability/Performance, O&M Contracts, Planning/Scheduling/, Sites Readiness Reviews |
| Founded | 2021 |
| Employees | 11-20 |
Key Contacts at IBERICA Energy & Data Centers
Jose Angel
Operations Director - Onshore / Offshore Energy At Ibérica Energy No
Pedro Mouras
Socio Director - Operaciones Latam
Daniel Tudor
Associate Director Project And Commissioning Management
IBERICA Energy & Data Centers Email Formats
IBERICA Energy & Data Centers uses 1 email format. The most common is {first name}.{last name} (e.g., john.doe@ibericaenergy.com), used 100% of the time.
| Format | Example | Percentage |
|---|---|---|
{first name}.{last name} | john.doe@ibericaenergy.com | 100% |
About IBERICA Energy & Data Centers
Profesional services company, specialized in Power Generation, Substations and Hyperscale Data Center Projects within the EMEA & LATAM Regions. We provide Strategic Consultancy and Technical Resources for Design, Planning, Project Management, Contract & Cost, HSE, Qa-QC, Controlling Energy Marshals, SAP/AP, MEP Coordination, Commissioning, O&M teams associated to Power Generation, T&D systems, Substations for HV interconnections with MV/LV power distribution systems, I&C, Protections & SCADA Networks, PLC, HMI Servers, DCS, BMS, EPMS, PQM, PUE. Full Sequence of Operations, Control Phylosophy, Functional Descriptions, Logic Diagrams, PLC & Protection Relays Programming. FAT/Installation/SAT. Gas and Steam Turbine Packages from 3M modular solution to 300MW Heavy duty Power stations. FAT/SAT for HV/MVLV GIS, AIS, TXs, GPS, RMU, Black start/Emergency Diesel Generators, UPS systems, as well as VLV Auxiliary Systems and Mechanical Infrastructure for Water Treatment, Cooling and Fuel Systems. Expertise in Data Centers Commissioning L1 to Level 3 stand alone load testing and L4 Mechanical Heat Load Test. Level 5 IST Full Sequence of Operation, Failure Scenarios, Building blackout, Reliability/Performance and Integrated Systems Testing within the scope of the BOP/MEP infrastructure. ● Project development from Site Selection, EPC, O&M. ● PMP, Construction and Commissioning management. ● Switchyards, Renewables, Combined Cycles & Data Center Projects. ● Auditing over Technical Requirements, Specifications, Applicable standards. ● Consultation regarding compliance with local regulations and legalization of Electrical, Mechanical, Control Systems/Infrastructure prior Commissioning.
IBERICA Energy & Data Centers revenue & valuation
| Annual revenue | $1,283,325 |
| Revenue per employee | $86,000 |
| Estimated valuation?This valuation is estimated based on industry average for the Business Consulting and Services industry and current estimated revenues | $4,200,000 |
| Total funding | No funding |
Employees by Management Level
Total employees: 11-20
Seniority
Employees
Employees by Department
IBERICA Energy & Data Centers has 5 employees across 4 departments.
Departments
Number of employees
Funding Data
IBERICA Energy & Data Centers has never raised funding before.
Frequently asked questions
4.8
40,000 users



