Prospeo
Hero Section BackgroundHero Section Background
Kakamas Hydro Electric Power (KHEP)

Kakamas Hydro Electric Power (KHEP)

Renewable EnergyFlag of ZASouth Africa1-10 Employees

Company overview

HeadquartersSouth Africa
Website
NAICS33441
Employees1-10
Socials

Key Contact at Kakamas Hydro Electric Power (KHEP)

Flag of ZA

Jonathan Dhlamini

Non Executive Director

About Kakamas Hydro Electric Power (KHEP)

Kakamas Hydro Electric Power – Neusberg Weir Kakamas Hydro Electric Power (Pty) Ltd (KHEP ), is a consortium comprised of HydroSA, Hydro Tasmania, Old Mutual and the Kakamas Community Trust. KHEP was awarded preferred bidder status in Round 2 of the REIPP Program in May 2013. Construction commenced in July 2013 and was completed in January 2015. The project is a run-of-river hydro power station that uses the natural flow and drop in elevation of a river to produce electricity. It is located at the Neusberg weir approximately 12km east of the town of Kakamas. KHEP will generate 71.9 GWh of base load energy per year, enough to provide power to approximately 5 000 households. The 10 MW Neusberg Hydro Electric Power Project consists of: An offtake weir and 130m of inlet canal An inlet structure fitted with a radial gate 1400 m of open canal waterway A reinforced concrete forebay structure A partially buried powerhouse 300 m long tailrace canal A 21km long 33 kV transmission line to the Eskom distribution network The powerhouse is run by three 4.01MW horizontal axis Kaplan turbines which have been installed in the turbine chamber. The turbine chamber has no above ground superstructure. Access for large equipment to the machine floor is through a service hatch in the roof, which is at ground level. The Neusberg Hydro Electric Project will be operated remotely from Hydro Tasmania’s Control Centre in Tasmania.

$

Kakamas Hydro Electric Power (KHEP) revenue & valuation

Annual revenue$513,330
Revenue per employee$86,000
Estimated valuation?$1,700,000
Total fundingNo funding

Employees by Management Level

Total employees: 1-10

Seniority

Employees

Entry
Director

Employees by Department

Kakamas Hydro Electric Power (KHEP) has 1 employees across 1 departments.

Departments

Number of employees

Funding Data

Kakamas Hydro Electric Power (KHEP) has never raised funding before.

Frequently asked questions

Kakamas Hydro Electric Power (KHEP) is located in ZA.
Kakamas Hydro Electric Power (KHEP) has approximately 1-10 employees. The company continues to grow its workforce to support its business operations and expansion.

4.8

40,000 users

top 50
high performer
most used
tier 1 accuracy

Build leads list with verified emails & mobiles