


Lefdal Mine Data Centers Email Formats
IT Services and IT Consulting • Kjølsdalen, Vestland, Norway • 21-50 Employees
Lefdal Mine Data Centers Email Formats
Lefdal Mine Data Centers uses 2 email formats. The most common is {first name}.{last name} (e.g., john.doe@lefdalmine.com), used 69.2% of the time.
| Format | Example | Percentage |
|---|---|---|
{first name}.{last name} | john.doe@lefdalmine.com | 69.2% |
{first initial}.{last name} | j.doe@lefdalmine.com | 30.8% |
Key Contacts at Lefdal Mine Data Centers
Jørn Skaane
Ceo
Marcus Bartolini
Sales Director
Company overview
| Headquarters | Kjølsdalen, Vestland, Norway |
| Phone number | +4756994191 |
| Website | |
| NAICS | 5415 |
| SIC | 737 |
| Keywords | Sustainability, Colocation, Security, Storage, Low Cost, Cooling, HPC, Data Center, Renewable Power, Energy Efficency |
| Founded | 2011 |
| Employees | 21-50 |
| Socials |
About Lefdal Mine Data Centers
Our vision is to offer the most cost effective, secure, flexible and green data center solution in Europe. Several key differentiators build up our unique value proposition. Power – Renewable, stable and at low cost LMD is located near 350 MW renewable power production. The national grid is next to the facility with a capacity of 2 500 MW. Surplus power production in the region of 6.7 TWh. Long term power prices available at leading low cost. Effective cooling solution The LMD cooling solution will enable the facility to run with an industry leading PUE guaranteed between 1.08 and 1.15 depending on UPS configuration. Our water cooling enables 50 KW/rack. Leading green LMD is Europe’s greenest data center. In addition to running on renewable power and operating with low PUE, the CO2 emission is “0” and the footprint limited. The mine is already there and the material required to build out capacity is low. The main part of the facility is not visible to the surroundings. There is no need for evaporative systems for cooling and the WUE (Water Usage Effectiveness) is “0”. Flexibility – Growth, density and product solutions The flexibility is unique, with a “pay as you go” capacity. The size of the facility - 120.000 m2 whitespace - and the logistics allows different product solutions in a cost effective way. We can facilitate all known concepts for white space solutions and the facility structure enables a streamlined solution for containers in different shapes and sizes. LMD can customize power density, temperature, humidity, operational equipment, tier level and all related services. Time to market is 8 weeks for large scale capacity. Services up to IaaS are offered on pure lease models. High Security LMD is a Tier 3 data center service inside several secure mountain halls. The data is EMP protected. The facility has access from two single points of entry. This offers a high level of natural security and access control.
Employees by Management Level
Total employees: 21-50
Seniority
Employees
Employees by Department
Lefdal Mine Data Centers has 24 employees across 9 departments.
Departments
Number of employees
Funding Data
Lefdal Mine Data Centers has never raised funding before.
Lefdal Mine Data Centers Tech Stack
Discover the technologies and tools that power Lefdal Mine Data Centers's digital infrastructure, from frameworks to analytics platforms.
Font scripts
JavaScript frameworks
Surveys
Programming languages
JavaScript frameworks
Miscellaneous
Security
UI frameworks
Miscellaneous
PaaS
CDN
Frequently asked questions
4.8
40,000 users



