


R3X Group Email Formats
Environmental Services • • 1-10 Employees
R3X Group Email Formats
R3X Group uses 2 email formats. The most common is {first name} (e.g., john@r3xgroup.com), used 90.9% of the time.
| Format | Example | Percentage |
|---|---|---|
{first name} | john@r3xgroup.com | 90.9% |
{first initial} | j@r3xgroup.com | 9.1% |
Key Contact at R3X Group
Sammy Rodriguez
President
Company overview
| Headquarters | XX |
| Website | |
| NAICS | 54162 |
| Founded | 2018 |
| Employees | 1-10 |
About R3X Group
Summary of Services: Caltrans comprehensive project management, including encroachment permits, engineering and design, surveying, stormwater, and CEQA/NEPA environmental compliance; Extensive experience negotiating the approval of broadband projects with Caltrans Headquarters; Extensive experience consulting with HDD contractors for verifying design feasibility of broadband projects in complex environments; Arborist services; Biological Assessments and Evaluations under state and federal Endangered Species Acts; Jurisdictional waters/wetlands delineations and determinations; NHPA Section 106 and 110 Compliance; Native American Consultation and Coordination; Archaeological Field Surveys, Evaluation, and Data Recovery; Construction risk assessment of environmentally contaminated project areas; Geotechnical assessments; Ground penetrating radar assessments; Environmental Impact Reports; Initial Study/Mitigated Negative Declarations; Environmental Assessments, Categorical Exemptions and Exclusions; CEQA and environmental permit mitigation monitoring during construction phases of projects; California Fish & Game Code (Sections 1600-1607, including Lake/Streambed Alteration Agreements); Federal Clean Water Act, Section 404 Permits (Nationwide, Regional General, Standard Individual, including preparation of Formal Wetland Delineation Reports); Section 401 Water Quality Certifications; Section 402 National Pollutant Discharge Elimination System permits from the State Water Resources Control Board, through the local RWQCB; Clean Water Act Section 404 Dredge and Fill permits through U.S. Army Corps of Engineers; Waste Discharge Requirements (WDRs) from the State Water Resources Control Board, through the RWQCB; Stormwater Plan Preparation (SWPPP, WPCP, ESCP); Stormwater Compliance/Inspections (Qualified SWPPP Develop
Employees by Management Level
Total employees: 1-10
Seniority
Employees
Employees by Department
R3X Group has 5 employees across 3 departments.
Departments
Number of employees
Funding Data
R3X Group has never raised funding before.
Frequently asked questions
4.8
40,000 users



