


SKS Sorg Keramik Service Email Formats
Glass, Ceramics and Concrete Manufacturing • Lohr, Bavaria, Germany • 11-20 Employees
SKS Sorg Keramik Service Email Formats
SKS Sorg Keramik Service uses 2 email formats. The most common is {last name} (e.g., doe@sks.net), used 93.8% of the time.
| Format | Example | Percentage |
|---|---|---|
{last name} | doe@sks.net | 93.8% |
@sks.net | 6.2% |
Key Contacts at SKS Sorg Keramik Service
Jorge Silva
Project And Commercial Director
Herbert Lorz
Managing Director
Company overview
| Headquarters | Stoltestr, 23 - 97816, Lohr am Main, Germany, DE |
| Website | |
| NAICS | 327 |
| SIC | 171 |
| Keywords | Supervision, Technical Services, Maintenance, Demolition, Monitoring, Refractory, Draining, Steel Supply, Pavings, Steel Assembly, Bottom Drill Tests, E-Holder Exchanges, Glass Melters, Glass To Glass, Heat Up, Regenerators Cleaning |
| Employees | 11-20 |
| Socials |
About SKS Sorg Keramik Service
The installation of a glass melting furnace requires know how but also the collaboration of many partners that are involved. For new builds, SKS takes over the responsibility for the steel and refractory installation as well as the hot sealing. All other services can be provided together with our Group partners. More complex and time critical are the glass to glass projects, where SKS takes over the compete responsibility to perform all necessary steps to achieve the goal within the given time frame. Close hand in hand planning guarantees that no time is lost between the different phases. Glass to glass projects cover the following aspects: Draining: We provide all equipment and carry out all works to safely empty the furnace. Back cooling systems and modern scrapers ensure environmentally safe glass recovery. Demolition: Especially when parts of the furnace will be reused, the coordination of the demolition is essential for a fast removal of the steel and ceramic waste material. Supply of steelwork: We supply the furnace steel, for the support, the bracing, the platforms, walkways and also for the forehearths. Installation of the steelwork: Our long lasting experience guarantees high quality and fast realization of the steel installation. Installation of the refractories: The refractory installation, especially for the glass contact materials, is the most essential part of the construction with respect to further campaign success. Effective site supervision is guaranteed to ensure that safety and quality standards are met and maintained all the time. Furnace heat-up: The heat up is the most critical part of the project, independent whether it is a repair or a new build. 24 hour monitoring and accurate expansion management guarantees a safe and trouble free heat up. Services: - Changing of bottom electrode holders - Installation of a side electrode holder - Test drillings at the furnace bottom - Pavings - Other Services
Employees by Management Level
Total employees: 11-20
Seniority
Employees
Employees by Department
SKS Sorg Keramik Service has 3 employees across 3 departments.
Departments
Number of employees
Funding Data
SKS Sorg Keramik Service has never raised funding before.
SKS Sorg Keramik Service Tech Stack
Discover the technologies and tools that power SKS Sorg Keramik Service's digital infrastructure, from frameworks to analytics platforms.
Programming languages
Caching
JavaScript frameworks
JavaScript libraries
Miscellaneous
JavaScript libraries
Web servers
JavaScript libraries
Programming languages
Blogs
Analytics
Frequently asked questions
4.8
40,000 users



