


MixOnSite Email Formats
Construction • Vernon, Illinois, United States • 11-20 Employees
MixOnSite Email Formats
MixOnSite uses 2 email formats. The most common is {first initial}{last name} (e.g., jdoe@mixonsite.com), used 69.2% of the time.
| Format | Example | Percentage |
|---|---|---|
{first initial}{last name} | jdoe@mixonsite.com | 69.2% |
{first name}{last name} | johndoe@mixonsite.com | 30.8% |
Key Contact at MixOnSite
Jordan Wolfe
President
Company overview
| Headquarters | 1501 Abbott Ct, Buffalo Grove, IL 60089, US |
| Phone number | +18005593511 |
| Website | |
| NAICS | 23 |
| SIC | 177 |
| Founded | 2000 |
| Employees | 11-20 |
| Socials |
About MixOnSite
MixOnSite is a nationwide contractor whose mission is to provide customers with cost effective, innovative solutions to tough geotechnical and underground construction challenges. Our company specializes in lightweight foam concrete solutions for annular space grouting, tunnel backfill, load reducing fills or abandonment/void filling. Feel free give us a call on (800) 559-3511 or visit us on the web www.mixonsite.com for more information. Projects of interest include the following: Produced and placed over 40,000 cubic yards of Geofill Low Density Cellular Concrete adjacent to MSE walls on the Expo LTR Phase 2 in California. Daily production rates of over 1,000 cubic yards were achieved. Production and long distance pumping of Geofill LD foam concrete to backfill the Brightwater East Tunnel in Washington. Over 70,000 cubic yards of low density materials were placed with pumping distances exceeding 2.5 miles. Produced and placed over 5,000 cubic yards of Geofill LD over existing floors as a leveling course at Modera Lofts in New Jersey. Other projects of interest include under water placements of Geofill LD Marine grout. Geofill LD Marine cellular (foam) concrete is specifically formulated for use in underwater placement applications. Geofill LD Marine is a lightweight, impervious material which remains in a cohesive, well blended mix when placed or pumped into a submerged environment. We have completed several projects in the NY/NJ area to encapsulate and protect timber piles that were under attack by Shipworms, Marine Borers and other organisms. This method of repair/protection is a preferred choice to either replacement or wrapping of individual piles. Due to the weakness of the river bottom soils, it is important to keep the protective backfill material close to the weight of water.
Employees by Management Level
Total employees: 11-20
Seniority
Employees
Employees by Department
MixOnSite has 6 employees across 3 departments.
Departments
Number of employees
Funding Data
MixOnSite has never raised funding before.
MixOnSite Tech Stack
Discover the technologies and tools that power MixOnSite's digital infrastructure, from frameworks to analytics platforms.
CDN
Widgets
JavaScript libraries
Editors
Operating systems
Tag managers
Cookie compliance
Cookie compliance
Web servers
UI frameworks
Web frameworks
Analytics
Frequently asked questions
4.8
40,000 users



